J JAZ Boards Request a quote

The shop

One building, four rooms, a small crew. Blanks, samples and full runs come off the same benches — nothing gets handed to a second factory two provinces away.

Deck press room Shaping bay Glassing room Paint booth
A row of finishing benches where boards are polished by hand

Inside the rooms

Press room, blank racks, and the crew that runs both.

The deck press room with the panel saw and stacks of blank panels
01Deck press room. Panel saw, presses, and blanks waiting for glue.
Racks of foam blanks waiting to be templated and shaped
02Blank racks. Foam waiting to be templated, planed and glassed.
Three workshop staff holding a finished deck in front of the benches
03The crew. The people who build the sample build the run.

On paper as well as on the floor

Awards held by the factory that builds these boards, issued by Anqing and Anhui authorities.

Four framed awards: AAA enterprise credit rating, provincial labour compliance demonstration unit, Anqing smart factory, financial trustworthiness enterprise
AAA enterprise credit · Provincial labour-compliance unit (2020) · Anqing smart factory (2021) · Financial trustworthiness (2021)

Long before a buyer asks, the paperwork exists: a credit rating, a labour-compliance recognition, a smart-factory designation and a financial-trustworthiness listing. Send us a request and we pass copies on with the quotation.

  • AAA enterprise credit ratingEnterprise credit evaluation, graded AAA against the national evaluation standard.
  • Anhui labour-compliance demonstration unit, 2020Awarded by the provincial human resources and social security department.
  • Anqing smart factory, 2021Designated by the Anqing bureau of economy and information technology.
  • Financial trustworthiness enterprise, 2021Listed by the Anqing branch of the People's Bank of China.

How a run gets made

Four stages, one roof. A run of twenty takes the same route as a run of eight hundred.

01

Press and cure

Seven plies get glued crossbanded and go into the press for 24 hours. The concave is in the blank before anyone touches it with a tool.

02

Shape and glass

Deck edges are squared, sealed and drilled. Foam is templated, planed and sanded to the stringer line, then glassed and left to cure.

03

Print and finish

Heat transfer or screen print on decks. Sand, gloss and polish on boards, with fin plugs set before anything is packed.

04

Check and pack

Every unit gets weighed, flexed and compared against the ticket. Then a photo of the batch goes to you before it ships.

From your drawing to the container

Six steps. Each one ends with something you can look at before the next one starts.

01

Send the file

Drawing, DXF, artwork or a board to copy — with dimensions on it.

02

Confirm the spec

Shape, material, printing and hardware settled line by line.

03

Quote

Priced against the confirmed spec and quantity, not against a guess.

04

Sample

7–12 working days, photographed and sent before it goes anywhere.

05

Approve

You sign off on the sample; the mould and the tooling stay as they are.

06

Run

15–25 working days by quantity, with batch photos before dispatch.

What gets checked

  • Flex and pop on every deck
  • Glue line and squared edges
  • Print registration against the file
  • Weight and dims against the ticket

What we need from you

  • Shape and dimensions, or a board you like
  • Quantity per shape and per print
  • Artwork at 300 dpi with 40 mm bleed

What you get back

  • A sample before the run, photographed
  • A dims sheet per shape
  • Batch photos before dispatch

What we can make

The list we send buyers as a one-page sheet, kept current.

Deck typeStandard skateboard, cruiser, fish board, longboard, dancing board, surf skate
Size and shapeCustom length, width, wheelbase, nose and tail. Send a drawing or a DXF file
Material7-ply maple, bamboo, maple–bamboo composite, fibreglass, carbon fibre
Graphic printingHeat transfer, UV printing, sublimation. Custom artwork welcome
LogoSilk print, embossed, debossed, laser engraving, UV logo
Surface finishClear grip, custom printed grip, matte or gloss varnish
HardwareTrucks, wheels, bearings, bushings — or the board shipped fully assembled
Files we acceptAI, EPS, PDF, DXF, PNG at 300 dpi, hand sketch with dimensions

Colour shifts between screens, so a sample is confirmed before mass production starts.

Order terms

The standard terms for private-label runs. Anything here can be talked about.

Minimum orderLow MOQ on custom graphics; sets negotiated on bulk orders
Sample lead time7–12 working days for decks, 10–14 days for boards
Production lead time15–25 working days after sample approval
PackagingPlain carton, printed carton, or your own design
ShippingEXW from our workshop, or FOB — port agreed per order
Payment50% deposit, balance before dispatch

Send a spec sheet, get a sample plan.